The R-6000 turns between 15 and 20 tonnes of plastic waste per day into pyrolysis oil, continuously and without prior polymer sorting. It is designed for waste managers, landfills and large concessions that need an industrial solution for their plastic rejects.
Nantek designs, finances, installs and operates it on a turnkey basis, with the same pyrolysis technology that runs at the Bilbao plant.
The plastic, baled or shredded, enters the reactor through a weighing system and feed screws. From around 100 °C, vapours are generated and pass to the condensation system, where they liquefy and are stored as pyrolysis oil. The gas that does not condense is cleaned and returns to the burner as fuel for the reactor itself, and the flue gases are treated to meet emission regulations.
A wax recovery system that prevents condenser blockage, one of the main causes of downtime in continuous pyrolysis.
An internal structure removes coke from the reactor and maintains heat transfer: up to 720 h of continuous, stable operation.
It separates the light and heavy oil fractions without the need for additional distillation equipment.
Hot flue gas recirculation and combustion air preheating: lower consumption, lower emissions and a longer furnace life.
Nitrogen at the feed inlet and sealed discharge with a material seal. The self-adjusting seal withstands up to 3 kPa.
Full-process control with PLC and remote monitoring included as standard, to minimise manual intervention.
| Capacity | 15–20 t/day of plastic waste (pellets or shredded) · ~6,000 t/year |
| Process type | Continuous thermal pyrolysis in a horizontal rotary reactor |
| Reactor material | 310S stainless steel (304/310S option) |
| Reactor dimensions | φ 1,800 × 19,200 mm · 16 mm thick |
| Continuous operation | 720 h without shutdown |
| Service life | 8–10 years |
| Installed power | 259 kW (standard configuration) |
| Heating | Recirculated hot air, burner of up to 2.5 Mkcal/h |
| Fuel | Diesel, fuel oil or natural gas at start-up; process gas and pyrolysis oil in steady state |
| Sealing | Self-adjusting high-temperature seal, up to 3 kPa |
| Required area | 50 × 20 m · maximum height 9 m |
| Staff | 4–6 operators per shift |
| Accepted plastics | All except PET, including film and mixed plastic |
| Control | PLC with remote monitoring (IoT) as standard |
The R-6000 is modular. For larger volumes, several lines are installed in series on the same site, and capacity grows in blocks of 6,000 t/year.
| Configuration | Capacity |
|---|---|
| 1 × R-6000 | 6,000 t/year |
| 2 × R-6000 | 12,000 t/year |
| 3 × R-6000 | 18,000 t/year |
| 4 × R-6000 | 24,000 t/year |
And so on: each additional line adds 6,000 t/year.
| System | What it includes |
|---|---|
| Feeding | Continuous weighing (0–2 t/h), steep-angle belt conveyor and feed screw with variable-speed drive |
| Reactor | Rotary reactor with riding rings, coke removal, ceramic fibre insulation and 15 kW drive with variable-speed control |
| Heating | Burner of up to 2.5 Mkcal/h, air preheater, induced-draught fan (14,000 Nm³/h) and flame arrester |
| Inerting | Nitrogen generator, 0–50 m³/h |
| Solids discharge | Water-cooled discharge screws with material-level seal |
| Gas scrubbing | 5 m³ spray tank, primary and secondary scrubbing towers and wax recovery |
| Condensation | Primary and secondary condensers, gas-liquid separator, water seals and 7.5 m³ oil tank |
| Cooling | Three cooling towers and circulation pumps |
| Control | Smart PLC cabinet with remote monitoring |
Weld inspection with non-destructive testing, pressure and leak tests, furnace runout check and rotation tests of screws and fans.
Verification of assembly, leak-tightness, electrical checks, a dry run of at least 2 h and testing of safety functions and emergency shutdown.
As-built drawings (P&ID, electrical, layout and foundation), operation and maintenance manuals, test reports and operator training.
The Bilbao plant converts mixed plastic waste into circular pyrolysis oil, under mass balance. Issued by CGN.
ISCC-PLUS-Cert-ES216-20247068Nantek's pyrolysis oil is registered in the European Union for more than 1,000 t/year.
01-2120087458-42-0010 · 17/05/2024Between 15 and 20 tonnes of plastic waste per day, about 6,000 tonnes per year in continuous operation.
As a reference, around 70% of the incoming plastic becomes oil: about 4,200 tonnes per year.
An area of 50 × 20 metres with a maximum height of 9 metres.
Between 4 and 6 operators per shift. The process is automated with PLC and remote monitoring.
All plastics except PET, including film and mixed plastic, without prior sorting by polymer.
Nantek delivers the plant turnkey in about 10 months.
Yes. The R-6000 is modular: several lines are installed on the same site. Two lines process 12,000 t/year, three 18,000 t/year and four 24,000 t/year.