{"id":11478,"date":"2026-06-15T10:15:47","date_gmt":"2026-06-15T10:15:47","guid":{"rendered":"https:\/\/nantek.es\/?p=11478"},"modified":"2026-10-19T14:43:46","modified_gmt":"2026-10-19T14:43:46","slug":"pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue","status":"publish","type":"post","link":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/","title":{"rendered":"Pyrolysis for landfills and large waste managers: from financial liability to recurring revenue"},"content":{"rendered":"<p>For a landfill or a large waste manager, plastic rejects are today a liability: they use up cell capacity, pay tax per tonne and clash with the 2035 landfill targets. Pyrolysis changes the equation because it transforms those rejects into oil and other products that have a buyer, so the tonne that used to cost money starts generating recurring revenue. This article explains where the cost lies, how it turns into revenue and what it takes to integrate pyrolysis into an environmental complex.<\/p>\n<h2>Why plastic rejects are a financial liability<\/h2>\n<p>Much of the plastic that arrives at a landfill or leaves a treatment plant has no outlet in mechanical recycling. It consists of dirty films, multilayers, polymer mixtures and contaminated fractions. Its usual destination is the cell. And every tonne that goes into the cell carries three costs that tend to be analysed separately, even though they add up.<\/p>\n<h3>Cell lifespan<\/h3>\n<p>A landfill&#8217;s permitted capacity is finite. Plastic has a low density even when compacted, so it takes up a disproportionate volume relative to its weight. Every cubic metre it occupies brings forward the exhaustion of the cell and, with it, the need to open a new one, with its environmental permitting, investment and local opposition. Ceasing to bury plastic means, in practice, extending the life of the waste manager&#8217;s most expensive asset.<\/p>\n<h3>Landfill tax<\/h3>\n<p>Since 1 January 2023, Spain&#8217;s Waste Law 7\/2022 has taxed the delivery of waste to landfill, incineration and co-incineration. The facility operator acts as a substitute taxpayer, meaning it collects the tax and pays it over. The state rates for non-hazardous waste landfills are as follows:<\/p>\n<table>\n<thead>\n<tr>\n<th>Waste delivered to a non-hazardous waste landfill<\/th>\n<th>State rate<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Municipal waste<\/td>\n<td>40 euros per tonne<\/td>\n<\/tr>\n<tr>\n<td>Municipal waste rejects<\/td>\n<td>30 euros per tonne<\/td>\n<\/tr>\n<tr>\n<td>Other waste exempt from prior treatment<\/td>\n<td>15 euros per tonne (with specific rules for the inert fraction)<\/td>\n<\/tr>\n<tr>\n<td>Other waste<\/td>\n<td>10 euros per tonne (with specific rules for the inert fraction)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Spain&#8217;s autonomous communities (regional governments) can raise these rates in their territory. By way of illustration, 10,000 tonnes a year of municipal rejects amount to 300,000 euros a year in state tax alone, before counting transport, the landfill gate fee or the opportunity cost of the cell. The details of that cost curve are in our analysis of <a href=\"https:\/\/nantek.es\/en\/the-cost-of-not-recovering-waste-the-real-landfill-cost-per-tonne-up-to-2030\/\">the real landfill cost per tonne up to 2030<\/a>.<\/p>\n<h3>Regulatory risk<\/h3>\n<p>The third cost is the hardest to quantify and the one that weighs most heavily in a boardroom: the risk that a business model based on landfill stops being viable before the concession ends.<\/p>\n<h2>The 2030 and 2035 targets that change the model<\/h2>\n<p>Directive (EU) 2018\/850, which amended the Landfill Directive, sets two milestones that directly affect large waste managers:<\/p>\n<ul>\n<li><strong>From 2030<\/strong>, Member States must endeavour to ensure that waste suitable for recycling or other recovery, in particular municipal waste, is not accepted in landfill, unless landfilling is the best environmental option.<\/li>\n<li><strong>By 2035<\/strong>, municipal waste landfilled must not exceed 10 % of the total generated, by weight.<\/li>\n<\/ul>\n<p>In Spain, the national framework sets out an intermediate path: a maximum of 40 % of municipal waste to landfill in 2025, 20 % in 2030 and 10 % in 2035. For a waste manager whose business depends on the volume buried, the conclusion is clear: the volume going into the cell is going to fall by obligation, not by choice. The question is whether those tonnes are lost or converted into another line of business. We explore this in <a href=\"https:\/\/nantek.es\/en\/zero-landfill-by-2035-what-the-eu-requires-and-how-to-prepare\/\">what the EU requires for zero landfill by 2035 and how to prepare<\/a>.<\/p>\n<h2>How pyrolysis turns cost into revenue<\/h2>\n<p>Pyrolysis thermally decomposes plastic in the absence of oxygen. It does not burn it: it breaks its long chains and turns them into shorter molecules. The result is three products: pyrolysis oil, gas and a carbonaceous solid residue or char. If you want to go over the process from scratch, the guide on <a href=\"https:\/\/nantek.es\/en\/what-is-plastic-waste-pyrolysis-and-how-does-it-turn-rejects-into-energy\/\">what plastic waste pyrolysis is<\/a> explains it step by step.<\/p>\n<p>For the waste manager, the sign flips. Before, every tonne of plastic rejects was a cash outflow: tax, cell and risk. With a pyrolysis plant, that same tonne feeds a process whose main product has an industrial buyer.<\/p>\n<h3>The revenue streams<\/h3>\n<ol>\n<li><strong>Sale of pyrolysis oil.<\/strong> This is the main product and goes to industry as a feedstock or fuel. More detail in <a href=\"https:\/\/nantek.es\/en\/pyrolysis-oil-gas-and-char-what-products-pyrolysis-generates-and-what-they-are-for\/\">what products pyrolysis generates and what they are for<\/a>.<\/li>\n<li><strong>Environmental credits.<\/strong> When the output is certified under schemes such as ISCC PLUS, the circular content has additional value in the supply chain.<\/li>\n<li><strong>Avoided costs.<\/strong> Landfill tax, transport and cell consumption that no longer occur.<\/li>\n<li><strong>Energy self-consumption.<\/strong> The gas generated can be used in the process itself.<\/li>\n<\/ol>\n<p>The sum of new revenue and avoided cost is what turns the project into a stable line of business rather than yet another environmental expense.<\/p>\n<h2>Protecting the concession and the environmental complex<\/h2>\n<p>Many large waste managers operate under public concessions or long-term contracts with municipalities and groupings of municipalities. Those contracts are reviewed, extended or put out to tender again. In that negotiation, the waste manager who arrives with a recovery solution for rejects is in a stronger position than one who can only offer more cell capacity.<\/p>\n<h3>What pyrolysis brings to the complex<\/h3>\n<ul>\n<li><strong>Verifiable compliance<\/strong> with the waste hierarchy and with landfill diversion targets.<\/li>\n<li><strong>More years of useful life<\/strong> for the existing cell, postponing investment in new phases.<\/li>\n<li><strong>Physical integration<\/strong> into a complex that already has land, permits, access roads, a weighbridge and waste intake logistics.<\/li>\n<li><strong>A different public narrative<\/strong>: the complex is no longer just the place where waste is buried but where it is transformed.<\/li>\n<\/ul>\n<p>Pyrolysis does not compete with separate collection or with mechanical recycling. It works downstream, with what they reject. Nor is it incineration: the aim is to obtain products, not energy from burning the waste. The difference is explained in <a href=\"https:\/\/nantek.es\/en\/pyrolysis-vs-incineration-why-recovery-is-not-the-same-as-burning\/\">pyrolysis versus incineration<\/a>.<\/p>\n<h2>A real case: C\u00f3rdoba and Sadeco<\/h2>\n<p>In 2025, Nantek signed an agreement with Sadeco, the municipal sanitation company of C\u00f3rdoba, and with the City Council to recover plastic waste through pyrolysis. The project is planned in phases:<\/p>\n<table>\n<thead>\n<tr>\n<th>Phase<\/th>\n<th>Capacity<\/th>\n<th>Investment<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>First phase<\/td>\n<td>16,000 tonnes a year<\/td>\n<td>22 million euros<\/td>\n<\/tr>\n<tr>\n<td>Planned expansion<\/td>\n<td>Up to 54,000 tonnes a year<\/td>\n<td>65 million euros in total<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The case illustrates the approach described here: a public waste manager with a stable flow of rejects, a prudently sized first phase and modular growth as the operation consolidates.<\/p>\n<h2>How Nantek solves it<\/h2>\n<p>A waste manager does not need a standalone technology. It needs a complete project that does not compromise its balance sheet or its day-to-day operations. That is why Nantek offers an end-to-end model:<\/p>\n<ul>\n<li><strong>Validated technology.<\/strong> Thermal pyrolysis without catalysts, with in-house developed reactive agents. It accepts mixed plastic without prior sorting by type, which is precisely the profile of rejects. The technology has been validated since 2022 at the industrial plant in the Port of Bilbao with plastics from a range of sources.<\/li>\n<li><strong>Modular plants<\/strong> from 1,500 to 16,000 tonnes a year, sized to the actual volume of rejects.<\/li>\n<li><strong>Turnkey EPC<\/strong> with fixed scope and price.<\/li>\n<li><strong>Structured financing<\/strong> of up to 70 % of the project.<\/li>\n<li><strong>O&amp;M<\/strong> with remote monitoring and proprietary software.<\/li>\n<li><strong>Offtake<\/strong>: guaranteed purchase of 100 % of the product under long-term contracts.<\/li>\n<li><strong>Environmental credits<\/strong>: Nantek manages the certifications and passes part of the net profit on to the client.<\/li>\n<\/ul>\n<p>Nantek holds ISCC, ISCC PLUS and CGN certifications and is registered with ECHA. You can see how the pieces fit together in the details of <a href=\"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/\">how a pyrolysis plant is financed<\/a>.<\/p>\n<h2>What data is needed to assess the project<\/h2>\n<p>A serious assessment starts from the waste manager&#8217;s own data, not from generic assumptions:<\/p>\n<ul>\n<li>Annual tonnes of plastic rejects and their seasonality.<\/li>\n<li>Approximate composition: type of plastic, moisture, content of non-target materials.<\/li>\n<li>Remaining cell capacity and time to exhaustion.<\/li>\n<li>Current cost per tonne: tax, gate fee, transport.<\/li>\n<li>Land, permits and services available at the complex.<\/li>\n<li>Term and conditions of the current concession or contract.<\/li>\n<\/ul>\n<p>With that information, the plant is sized, the output is estimated and the financial case is built.<\/p>\n<h2>Frequently asked questions about pyrolysis for landfills and large waste managers<\/h2>\n<h3>What type of plastic does Nantek&#8217;s pyrolysis accept?<\/h3>\n<p>Mixed plastic, with no need to sort it by type beforehand. This is the usual profile of rejects from treatment plants and landfills.<\/p>\n<h3>How much does a landfill pay today for each tonne of rejects?<\/h3>\n<p>The Spanish state tax is 30 euros per tonne for municipal waste rejects and 40 euros for untreated municipal waste, at a non-hazardous waste landfill. The autonomous communities can increase it. On top of that come the gate fee, transport and cell consumption.<\/p>\n<h3>What does the EU require for 2035?<\/h3>\n<p>That municipal waste landfilled does not exceed 10 % of the total generated. In addition, from 2030 Member States must endeavour not to accept in landfill waste suitable for recycling or other recovery.<\/p>\n<h3>Does the waste manager have to finance the whole plant?<\/h3>\n<p>No. Nantek offers structured financing of up to 70 % and an EPC contract at a fixed price.<\/p>\n<h3>Who buys the pyrolysis oil?<\/h3>\n<p>Nantek guarantees the purchase of 100 % of the product through long-term contracts, which gives visibility over revenue.<\/p>\n<h3>Is there a project under way with a public waste manager?<\/h3>\n<p>Yes. In C\u00f3rdoba, with Sadeco and the City Council: a first phase of 16,000 tonnes a year and a planned expansion to 54,000 tonnes a year.<\/p>\n<p>If you manage a landfill, a treatment plant or an environmental complex and want to know how much your plastic rejects are worth rather than how much they cost you, <a href=\"https:\/\/nantek.es\/en\/contact-2\/\">request an assessment from Nantek<\/a>. We analyse your volume, your current cost and how a modular plant would fit into your facility.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For a landfill or a large waste manager, plastic rejects are today [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3061,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[106,105],"tags":[],"class_list":["post-11478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plant","category-pyrolysis"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pyrolysis for Landfills and Large Waste Managers | Nantek<\/title>\n<meta name=\"description\" content=\"How pyrolysis turns landfill and large-manager rejects into recurring revenue, protects the cell and strengthens regulatory compliance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pyrolysis for Landfills and Large Waste Managers | Nantek\" \/>\n<meta property=\"og:description\" content=\"How pyrolysis turns landfill and large-manager rejects into recurring revenue, protects the cell and strengthens regulatory compliance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/\" \/>\n<meta property=\"og:site_name\" content=\"Nantek - Sustainable Solutions\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-15T10:15:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nantek.es\/wp-content\/uploads\/convertir-residuos-plasticos-en-energia-2.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"798\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"bkn@bikain.studio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"bkn@bikain.studio\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/\"},\"author\":{\"name\":\"bkn@bikain.studio\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/person\\\/b14b4b5281b50c857250cd9944820db4\"},\"headline\":\"Pyrolysis for landfills and large waste managers: from financial liability to recurring revenue\",\"datePublished\":\"2026-06-15T10:15:47+00:00\",\"dateModified\":\"2026-10-19T14:43:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/\"},\"wordCount\":1596,\"publisher\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/convertir-residuos-plasticos-en-energia-2.jpeg\",\"articleSection\":[\"Plant\",\"Pyrolysis\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/\",\"url\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/\",\"name\":\"Pyrolysis for Landfills and Large Waste Managers | Nantek\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/convertir-residuos-plasticos-en-energia-2.jpeg\",\"datePublished\":\"2026-06-15T10:15:47+00:00\",\"dateModified\":\"2026-10-19T14:43:46+00:00\",\"description\":\"How pyrolysis turns landfill and large-manager rejects into recurring revenue, protects the cell and strengthens regulatory compliance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/#primaryimage\",\"url\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/convertir-residuos-plasticos-en-energia-2.jpeg\",\"contentUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/convertir-residuos-plasticos-en-energia-2.jpeg\",\"width\":1200,\"height\":798,\"caption\":\"Refus plastique destin\u00e9 \u00e0 la valorisation par pyrolyse\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/nantek.es\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pyrolysis for landfills and large waste managers: from financial liability to recurring revenue\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#website\",\"url\":\"https:\\\/\\\/nantek.es\\\/\",\"name\":\"Nantek - Sustainable Solutions\",\"description\":\"from plastic waste to new raw materials\",\"publisher\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/nantek.es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\",\"name\":\"Nantek\",\"alternateName\":\"Nantek Hub SL\",\"url\":\"https:\\\/\\\/nantek.es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/horizontal-nantek-logo-and-title.png\",\"contentUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/horizontal-nantek-logo-and-title.png\",\"width\":159,\"height\":22,\"caption\":\"Nantek\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/nantekhub\\\/\",\"https:\\\/\\\/youtube.com\\\/@nantekhub\",\"https:\\\/\\\/www.instagram.com\\\/nantek.es\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/person\\\/b14b4b5281b50c857250cd9944820db4\",\"name\":\"bkn@bikain.studio\",\"sameAs\":[\"http:\\\/\\\/nantek.es\"],\"url\":\"https:\\\/\\\/nantek.es\\\/en\\\/author\\\/bknbikain-studio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pyrolysis for Landfills and Large Waste Managers | Nantek","description":"How pyrolysis turns landfill and large-manager rejects into recurring revenue, protects the cell and strengthens regulatory compliance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/","og_locale":"en_US","og_type":"article","og_title":"Pyrolysis for Landfills and Large Waste Managers | Nantek","og_description":"How pyrolysis turns landfill and large-manager rejects into recurring revenue, protects the cell and strengthens regulatory compliance.","og_url":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/","og_site_name":"Nantek - Sustainable Solutions","article_published_time":"2026-06-15T10:15:47+00:00","article_modified_time":"2026-10-19T14:43:46+00:00","og_image":[{"width":1200,"height":798,"url":"https:\/\/nantek.es\/wp-content\/uploads\/convertir-residuos-plasticos-en-energia-2.jpeg","type":"image\/jpeg"}],"author":"bkn@bikain.studio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"bkn@bikain.studio"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/#article","isPartOf":{"@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/"},"author":{"name":"bkn@bikain.studio","@id":"https:\/\/nantek.es\/#\/schema\/person\/b14b4b5281b50c857250cd9944820db4"},"headline":"Pyrolysis for landfills and large waste managers: from financial liability to recurring revenue","datePublished":"2026-06-15T10:15:47+00:00","dateModified":"2026-10-19T14:43:46+00:00","mainEntityOfPage":{"@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/"},"wordCount":1596,"publisher":{"@id":"https:\/\/nantek.es\/#organization"},"image":{"@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/#primaryimage"},"thumbnailUrl":"https:\/\/nantek.es\/wp-content\/uploads\/convertir-residuos-plasticos-en-energia-2.jpeg","articleSection":["Plant","Pyrolysis"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/","url":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/","name":"Pyrolysis for Landfills and Large Waste Managers | Nantek","isPartOf":{"@id":"https:\/\/nantek.es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/#primaryimage"},"image":{"@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/#primaryimage"},"thumbnailUrl":"https:\/\/nantek.es\/wp-content\/uploads\/convertir-residuos-plasticos-en-energia-2.jpeg","datePublished":"2026-06-15T10:15:47+00:00","dateModified":"2026-10-19T14:43:46+00:00","description":"How pyrolysis turns landfill and large-manager rejects into recurring revenue, protects the cell and strengthens regulatory compliance.","breadcrumb":{"@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/#primaryimage","url":"https:\/\/nantek.es\/wp-content\/uploads\/convertir-residuos-plasticos-en-energia-2.jpeg","contentUrl":"https:\/\/nantek.es\/wp-content\/uploads\/convertir-residuos-plasticos-en-energia-2.jpeg","width":1200,"height":798,"caption":"Refus plastique destin\u00e9 \u00e0 la valorisation par pyrolyse"},{"@type":"BreadcrumbList","@id":"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/nantek.es\/fr\/"},{"@type":"ListItem","position":2,"name":"Pyrolysis for landfills and large waste managers: from financial liability to recurring revenue"}]},{"@type":"WebSite","@id":"https:\/\/nantek.es\/#website","url":"https:\/\/nantek.es\/","name":"Nantek - Sustainable Solutions","description":"from plastic waste to new raw materials","publisher":{"@id":"https:\/\/nantek.es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nantek.es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/nantek.es\/#organization","name":"Nantek","alternateName":"Nantek Hub SL","url":"https:\/\/nantek.es\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nantek.es\/#\/schema\/logo\/image\/","url":"https:\/\/nantek.es\/wp-content\/uploads\/2024\/09\/horizontal-nantek-logo-and-title.png","contentUrl":"https:\/\/nantek.es\/wp-content\/uploads\/2024\/09\/horizontal-nantek-logo-and-title.png","width":159,"height":22,"caption":"Nantek"},"image":{"@id":"https:\/\/nantek.es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/nantekhub\/","https:\/\/youtube.com\/@nantekhub","https:\/\/www.instagram.com\/nantek.es\/"]},{"@type":"Person","@id":"https:\/\/nantek.es\/#\/schema\/person\/b14b4b5281b50c857250cd9944820db4","name":"bkn@bikain.studio","sameAs":["http:\/\/nantek.es"],"url":"https:\/\/nantek.es\/en\/author\/bknbikain-studio\/"}]}},"_links":{"self":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts\/11478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/comments?post=11478"}],"version-history":[{"count":2,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts\/11478\/revisions"}],"predecessor-version":[{"id":11600,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts\/11478\/revisions\/11600"}],"wp:attachment":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/media?parent=11478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/categories?post=11478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/tags?post=11478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}