{"id":11528,"date":"2026-06-28T19:54:21","date_gmt":"2026-06-28T19:54:21","guid":{"rendered":"https:\/\/nantek.es\/?p=11528"},"modified":"2026-10-19T14:43:43","modified_gmt":"2026-10-19T14:43:43","slug":"how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model","status":"publish","type":"post","link":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/","title":{"rendered":"How a pyrolysis plant is financed: the EPC + financing + offtake model"},"content":{"rendered":"<p>A pyrolysis plant is financed as an industrial project, not as the purchase of a piece of equipment: it combines a fixed-price turnkey EPC contract, structured debt based on the project&#8217;s cash flows, a long-term offtake agreement for the product and, where they fit, public grants. The offtake carries the most weight in bankability, because it turns uncertain revenue into contracted revenue. The investment depends mainly on capacity, scope and location; as a real benchmark, the first phase of the C\u00f3rdoba plant, with 16,000 t\/year, amounts to \u20ac22M.<\/p>\n<h2>Why a pyrolysis plant is not bought like a machine<\/h2>\n<p>A reactor on its own does not generate revenue. For the investment to pay off you need waste secured for years, a plant that runs with high availability, a buyer for the oil and permits in order. If any of those pieces fails, the project does not repay its debt.<\/p>\n<p>That is why financiers do not analyse only the technology. They analyse the set of contracts surrounding the plant and who bears each risk. The clearer that allocation, the more debt the project can take on and on better terms. The technical process is summarised in <a href=\"https:\/\/nantek.es\/en\/what-is-plastic-waste-pyrolysis-and-how-does-it-turn-rejects-into-energy\/\">what plastic waste pyrolysis is<\/a>.<\/p>\n<h2>The four pieces of the model: EPC, financing, O&amp;M and offtake<\/h2>\n<h3>Turnkey EPC<\/h3>\n<p>EPC stands for engineering, procurement and construction. Under the turnkey model, a single contractor designs, supplies, builds and commissions the plant with a fixed scope and price. The developer receives an operational facility and the contractor bears cost and schedule overruns within that scope. For a bank, this removes a large part of the construction risk, which is the main concern in the early phases.<\/p>\n<h3>Structured financing or project finance<\/h3>\n<p>In project finance the debt is repaid from the plant&#8217;s own cash flows, not from the developer&#8217;s balance sheet. A special purpose vehicle is set up to sign the contracts and receive the financing. The developer contributes a share as equity and the rest is debt. The amount of debt that can be raised depends on how predictable the revenue is and how robust the contracts are.<\/p>\n<h3>Operation and maintenance<\/h3>\n<p>An O&amp;M contract with an operator that knows the technology secures the plant&#8217;s availability. For the financier, a plant that is down is a loan that is not being repaid, so the operator&#8217;s experience counts as much as the design.<\/p>\n<h3>Offtake<\/h3>\n<p>The offtake agreement commits a buyer to purchase the output over a long period and on agreed terms. It is the contract that shapes the revenue line of the financial model.<\/p>\n<h2>Why the offtake decides bankability<\/h2>\n<p>A project is bankable when a financier can foresee with reasonable certainty that the cash flows will cover the debt. In pyrolysis, the main uncertainty usually lies on the commercial side: who buys the oil, at what price and for how long.<\/p>\n<p>A long-term offtake answers those three questions at once. It removes the risk of not finding a buyer, limits exposure to price volatility and makes it possible to project revenue for the full term of the loan. The higher the share of contracted output and the more creditworthy the buyer, the easier it is to finance.<\/p>\n<p>The other side of the equation is the incoming waste. A supply contract with a waste manager, a landfill or an industry with captive waste closes the loop. For many of them the plant also saves costs, as shown in <a href=\"https:\/\/nantek.es\/en\/the-cost-of-not-recovering-waste-the-real-landfill-cost-per-tonne-up-to-2030\/\">the real landfill cost per tonne<\/a>.<\/p>\n<p>On top of this revenue there may be income from certifying the product, which depends on its final destination. We explain it in <a href=\"https:\/\/nantek.es\/en\/iscc-plus-and-environmental-credits-how-to-certify-and-monetise-the-pyrolysis-output\/\">ISCC PLUS and environmental credits<\/a>.<\/p>\n<h2>How much a pyrolysis plant costs: what determines the investment<\/h2>\n<p>There is no list price. The figure depends on the project, and any serious estimate starts from a study of the waste and the site. The factors that move it most are:<\/p>\n<ul>\n<li><strong>Treatment capacity.<\/strong> Tonnes per year set the size of the equipment and, with it, the bulk of the investment.<\/li>\n<li><strong>Type and quality of the waste.<\/strong> Moisture, contaminants and degree of mixing determine the pre-treatment required.<\/li>\n<li><strong>EPC scope.<\/strong> Whether it includes civil works, buildings, pre-treatment, product storage and connections, or only the process core.<\/li>\n<li><strong>Location.<\/strong> Land that is already developed and serviced within a waste complex costs less to adapt than a new plot.<\/li>\n<li><strong>Permits and environmental approval.<\/strong> Timescales and requirements vary from one Spanish autonomous community (region) to another.<\/li>\n<li><strong>Phasing.<\/strong> Building in modules makes it possible to start with a smaller initial investment and expand later.<\/li>\n<\/ul>\n<p>As a public benchmark, in C\u00f3rdoba the first phase of the plant agreed with Sadeco (the city&#8217;s municipal waste company) and the City Council has a capacity of 16,000 t\/year and an investment of \u20ac22M. The planned expansion would take the plant to 54,000 t\/year, with a total investment of \u20ac65M. These are figures from a specific project: they give an idea of the order of magnitude at that scale, not a rate applicable to other cases.<\/p>\n<h2>Public grants that may fit<\/h2>\n<p>Grants rarely finance an entire plant, but they reduce the equity required and improve returns. It is worth reviewing each call, because they change from year to year.<\/p>\n<table>\n<thead>\n<tr>\n<th>Programme<\/th>\n<th>What it funds<\/th>\n<th>Points to bear in mind<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Spain&#8217;s Circular Economy PERTE (strategic recovery project, run by the Ministry for the Ecological Transition, MITECO, with Next Generation EU funds)<\/td>\n<td>Circularity projects in the plastics sector, including third-party waste management<\/td>\n<td>The latest plastics call, resolved in March 2026, awarded more than \u20ac150M to 115 projects, with grants from \u20ac100,000 to \u20ac8.7M; projects must be completed before 31 October 2027<\/td>\n<\/tr>\n<tr>\n<td>Hazitek (Basque Government, managed by SPRI)<\/td>\n<td>Industrial research and experimental development by companies operating in the Basque Country<\/td>\n<td>Co-financed by ERDF (FEDER) under the ERDF Basque Country Programme 2021-2027; geared towards R&amp;D, not commercial plants<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The distinction matters. The PERTE has supported industrial investment, whereas Hazitek funds prior technological development. Nantek, for example, is developing the REFIK R&amp;D project with Hazitek and ERDF funding. That kind of grant speeds up improvements to the technology, not the purchase of a plant.<\/p>\n<p>Regulatory pressure also works in favour of financing: with the European target to limit landfilling, waste managers need alternatives, as explained in <a href=\"https:\/\/nantek.es\/en\/zero-landfill-by-2035-what-the-eu-requires-and-how-to-prepare\/\">zero landfill by 2035<\/a>.<\/p>\n<h2>Project risks and how they are mitigated<\/h2>\n<ol>\n<li><strong>Technology risk.<\/strong> The plant not reaching the expected output. Mitigated with technology validated at industrial scale and with performance guarantees in the EPC contract.<\/li>\n<li><strong>Construction risk.<\/strong> Cost overruns and delays. Mitigated with an EPC with fixed scope and price.<\/li>\n<li><strong>Supply risk.<\/strong> Lack of waste or of adequate quality. Mitigated with long-term input contracts and with technology that accepts mixed plastic.<\/li>\n<li><strong>Market risk.<\/strong> Not selling the product or selling it cheaply. Mitigated with a long-term offtake.<\/li>\n<li><strong>Operational risk.<\/strong> Unplanned shutdowns. Mitigated with an O&amp;M contract and continuous monitoring.<\/li>\n<li><strong>Regulatory risk.<\/strong> Changes in permits or in how the products are treated. Mitigated with early permitting and valid certifications.<\/li>\n<\/ol>\n<h2>How Nantek solves it<\/h2>\n<p>Nantek brings all the pieces together in a <a href=\"https:\/\/nantek.es\/en\/the-model\/\">single end-to-end model<\/a>, with one point of contact:<\/p>\n<ul>\n<li><strong>Turnkey EPC<\/strong> with fixed scope and price.<\/li>\n<li><strong>Structured financing<\/strong> of up to 70 % of the investment.<\/li>\n<li><strong>O&amp;M<\/strong> with remote control and proprietary software.<\/li>\n<li><strong>Offtake:<\/strong> guaranteed purchase of 100 % of the product with long-term contracts.<\/li>\n<li><strong>Environmental credits:<\/strong> management of the certifications and part of the net profit passed on to the client.<\/li>\n<\/ul>\n<p>The technology, thermal pyrolysis without catalysts using proprietary reactive agents, has been validated since 2022 at the industrial plant in the Port of Bilbao, with mixed plastic and no prior sorting. The modular range goes from 1,500 to 16,000 t\/year, which makes it possible to size the plant to each client&#8217;s waste and investment capacity. It is aimed at <a href=\"https:\/\/nantek.es\/en\/pyrolysis-for-landfills-and-large-waste-managers-from-financial-liability-to-recurring-revenue\/\">landfills and large waste managers<\/a>, industry with captive waste, and public authorities and concession holders.<\/p>\n<h2>Frequently asked questions about financing a pyrolysis plant<\/h2>\n<h3>How much does a pyrolysis plant cost?<\/h3>\n<p>It depends on capacity, waste, scope and location. As a benchmark, the first phase of the C\u00f3rdoba plant, with 16,000 t\/year, amounts to \u20ac22M.<\/p>\n<h3>What is a turnkey EPC?<\/h3>\n<p>A contract in which a single contractor designs, supplies, builds and commissions the plant with a fixed scope and price.<\/p>\n<h3>Why is the offtake agreement so important?<\/h3>\n<p>Because it secures the sale of the product over the long term. Without predictable revenue, a financier cannot size the debt.<\/p>\n<h3>What share of the investment must the developer contribute?<\/h3>\n<p>It depends on the structure. Under Nantek&#8217;s model, structured financing can cover up to 70 % of the investment.<\/p>\n<h3>Are there grants for pyrolysis plants?<\/h3>\n<p>Schemes such as Spain&#8217;s Circular Economy PERTE for investment, or R&amp;D programmes such as Hazitek in the Basque Country, may fit. Each open call needs to be reviewed.<\/p>\n<p>If you are considering a plant and want to know how its financing would be structured, <a href=\"https:\/\/nantek.es\/en\/contact-2\/\">tell us about your case and we will study it with you<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A pyrolysis plant is financed as an industrial project, not as the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11297,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[106,105],"tags":[],"class_list":["post-11528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plant","category-pyrolysis"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How a Pyrolysis Plant Is Financed | Nantek<\/title>\n<meta name=\"description\" content=\"How a pyrolysis plant is financed: the turnkey model combines EPC, up to 70% structured financing and a guaranteed offtake of the product.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How a Pyrolysis Plant Is Financed | Nantek\" \/>\n<meta property=\"og:description\" content=\"How a pyrolysis plant is financed: the turnkey model combines EPC, up to 70% structured financing and a guaranteed offtake of the product.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/\" \/>\n<meta property=\"og:site_name\" content=\"Nantek - Sustainable Solutions\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-28T19:54:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1344\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"bkn@bikain.studio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"bkn@bikain.studio\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/\"},\"author\":{\"name\":\"bkn@bikain.studio\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/person\\\/b14b4b5281b50c857250cd9944820db4\"},\"headline\":\"How a pyrolysis plant is financed: the EPC + financing + offtake model\",\"datePublished\":\"2026-06-28T19:54:21+00:00\",\"dateModified\":\"2026-10-19T14:43:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/\"},\"wordCount\":1500,\"publisher\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"articleSection\":[\"Plant\",\"Pyrolysis\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/\",\"url\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/\",\"name\":\"How a Pyrolysis Plant Is Financed | Nantek\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"datePublished\":\"2026-06-28T19:54:21+00:00\",\"dateModified\":\"2026-10-19T14:43:43+00:00\",\"description\":\"How a pyrolysis plant is financed: the turnkey model combines EPC, up to 70% structured financing and a guaranteed offtake of the product.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/#primaryimage\",\"url\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"contentUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"width\":1344,\"height\":768,\"caption\":\"Usine de pyrolyse Nantek de 16 000 tonnes par an\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/nantek.es\\\/en\\\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/nantek.es\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How a pyrolysis plant is financed: the EPC + financing + offtake model\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#website\",\"url\":\"https:\\\/\\\/nantek.es\\\/\",\"name\":\"Nantek - Sustainable Solutions\",\"description\":\"from plastic waste to new raw materials\",\"publisher\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/nantek.es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\",\"name\":\"Nantek\",\"alternateName\":\"Nantek Hub SL\",\"url\":\"https:\\\/\\\/nantek.es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/horizontal-nantek-logo-and-title.png\",\"contentUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/horizontal-nantek-logo-and-title.png\",\"width\":159,\"height\":22,\"caption\":\"Nantek\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/nantekhub\\\/\",\"https:\\\/\\\/youtube.com\\\/@nantekhub\",\"https:\\\/\\\/www.instagram.com\\\/nantek.es\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/person\\\/b14b4b5281b50c857250cd9944820db4\",\"name\":\"bkn@bikain.studio\",\"sameAs\":[\"http:\\\/\\\/nantek.es\"],\"url\":\"https:\\\/\\\/nantek.es\\\/en\\\/author\\\/bknbikain-studio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How a Pyrolysis Plant Is Financed | Nantek","description":"How a pyrolysis plant is financed: the turnkey model combines EPC, up to 70% structured financing and a guaranteed offtake of the product.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/","og_locale":"en_US","og_type":"article","og_title":"How a Pyrolysis Plant Is Financed | Nantek","og_description":"How a pyrolysis plant is financed: the turnkey model combines EPC, up to 70% structured financing and a guaranteed offtake of the product.","og_url":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/","og_site_name":"Nantek - Sustainable Solutions","article_published_time":"2026-06-28T19:54:21+00:00","article_modified_time":"2026-10-19T14:43:43+00:00","og_image":[{"width":1344,"height":768,"url":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","type":"image\/jpeg"}],"author":"bkn@bikain.studio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"bkn@bikain.studio"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/#article","isPartOf":{"@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/"},"author":{"name":"bkn@bikain.studio","@id":"https:\/\/nantek.es\/#\/schema\/person\/b14b4b5281b50c857250cd9944820db4"},"headline":"How a pyrolysis plant is financed: the EPC + financing + offtake model","datePublished":"2026-06-28T19:54:21+00:00","dateModified":"2026-10-19T14:43:43+00:00","mainEntityOfPage":{"@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/"},"wordCount":1500,"publisher":{"@id":"https:\/\/nantek.es\/#organization"},"image":{"@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/#primaryimage"},"thumbnailUrl":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","articleSection":["Plant","Pyrolysis"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/","url":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/","name":"How a Pyrolysis Plant Is Financed | Nantek","isPartOf":{"@id":"https:\/\/nantek.es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/#primaryimage"},"image":{"@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/#primaryimage"},"thumbnailUrl":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","datePublished":"2026-06-28T19:54:21+00:00","dateModified":"2026-10-19T14:43:43+00:00","description":"How a pyrolysis plant is financed: the turnkey model combines EPC, up to 70% structured financing and a guaranteed offtake of the product.","breadcrumb":{"@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/#primaryimage","url":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","contentUrl":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","width":1344,"height":768,"caption":"Usine de pyrolyse Nantek de 16 000 tonnes par an"},{"@type":"BreadcrumbList","@id":"https:\/\/nantek.es\/en\/how-a-pyrolysis-plant-is-financed-the-epc-financing-offtake-model\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/nantek.es\/fr\/"},{"@type":"ListItem","position":2,"name":"How a pyrolysis plant is financed: the EPC + financing + offtake model"}]},{"@type":"WebSite","@id":"https:\/\/nantek.es\/#website","url":"https:\/\/nantek.es\/","name":"Nantek - Sustainable Solutions","description":"from plastic waste to new raw materials","publisher":{"@id":"https:\/\/nantek.es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nantek.es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/nantek.es\/#organization","name":"Nantek","alternateName":"Nantek Hub SL","url":"https:\/\/nantek.es\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nantek.es\/#\/schema\/logo\/image\/","url":"https:\/\/nantek.es\/wp-content\/uploads\/2024\/09\/horizontal-nantek-logo-and-title.png","contentUrl":"https:\/\/nantek.es\/wp-content\/uploads\/2024\/09\/horizontal-nantek-logo-and-title.png","width":159,"height":22,"caption":"Nantek"},"image":{"@id":"https:\/\/nantek.es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/nantekhub\/","https:\/\/youtube.com\/@nantekhub","https:\/\/www.instagram.com\/nantek.es\/"]},{"@type":"Person","@id":"https:\/\/nantek.es\/#\/schema\/person\/b14b4b5281b50c857250cd9944820db4","name":"bkn@bikain.studio","sameAs":["http:\/\/nantek.es"],"url":"https:\/\/nantek.es\/en\/author\/bknbikain-studio\/"}]}},"_links":{"self":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts\/11528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/comments?post=11528"}],"version-history":[{"count":2,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts\/11528\/revisions"}],"predecessor-version":[{"id":11603,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/posts\/11528\/revisions\/11603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/media\/11297"}],"wp:attachment":[{"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/media?parent=11528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/categories?post=11528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nantek.es\/en\/wp-json\/wp\/v2\/tags?post=11528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}