{"id":11530,"date":"2026-06-28T19:54:21","date_gmt":"2026-06-28T19:54:21","guid":{"rendered":"https:\/\/nantek.es\/?p=11530"},"modified":"2026-10-19T14:43:49","modified_gmt":"2026-10-19T14:43:49","slug":"comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti","status":"publish","type":"post","link":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/","title":{"rendered":"Comment financer une usine de pyrolyse : le mod\u00e8le EPC + financement + achat garanti"},"content":{"rendered":"<p>Une usine de pyrolyse se finance comme un projet industriel, et non comme l&rsquo;achat d&rsquo;un \u00e9quipement : on combine un contrat EPC cl\u00e9 en main \u00e0 prix ferme, une dette structur\u00e9e adoss\u00e9e aux flux du projet, un contrat d&rsquo;achat (offtake) du produit \u00e0 long terme et, lorsqu&rsquo;elles sont adapt\u00e9es, des aides publiques. L&rsquo;offtake est l&rsquo;\u00e9l\u00e9ment qui p\u00e8se le plus dans la bancabilit\u00e9, car il transforme un revenu incertain en revenu contractualis\u00e9. L&rsquo;investissement d\u00e9pend surtout de la capacit\u00e9, du p\u00e9rim\u00e8tre et de l&rsquo;implantation ; \u00e0 titre de r\u00e9f\u00e9rence r\u00e9elle, la premi\u00e8re phase de l&rsquo;usine de Cordoue, de 16 000 t\/an, repr\u00e9sente 22 M\u20ac.<\/p>\n<h2>Pourquoi une usine de pyrolyse ne s&rsquo;ach\u00e8te pas comme une machine<\/h2>\n<p>Un r\u00e9acteur \u00e0 lui seul ne g\u00e9n\u00e8re pas de revenus. Pour que l&rsquo;investissement soit rentabilis\u00e9, il faut un approvisionnement en d\u00e9chets garanti pendant des ann\u00e9es, une usine fonctionnant avec une haute disponibilit\u00e9, un acheteur pour l&rsquo;huile et des autorisations en r\u00e8gle. Si l&rsquo;un de ces \u00e9l\u00e9ments fait d\u00e9faut, le projet ne rembourse pas la dette.<\/p>\n<p>C&rsquo;est pourquoi les financeurs n&rsquo;analysent pas seulement la technologie. Ils analysent l&rsquo;ensemble des contrats qui entourent l&rsquo;usine et qui assume chaque risque. Plus cette r\u00e9partition est claire, plus le projet peut supporter de dette, et \u00e0 de meilleures conditions. Le proc\u00e9d\u00e9 technique est r\u00e9sum\u00e9 dans <a href=\"https:\/\/nantek.es\/fr\/quest-ce-que-la-pyrolyse-des-dechets-plastiques-et-comment-transforme-t-elle-le-rebut-en-energie\/\">qu&rsquo;est-ce que la pyrolyse des d\u00e9chets plastiques<\/a>.<\/p>\n<h2>Les quatre \u00e9l\u00e9ments du mod\u00e8le : EPC, financement, O&amp;M et offtake<\/h2>\n<h3>EPC cl\u00e9 en main<\/h3>\n<p>EPC signifie ing\u00e9nierie, approvisionnement et construction (Engineering, Procurement and Construction). Dans la formule cl\u00e9 en main, un contractant unique con\u00e7oit, fournit, construit et met en service l&rsquo;usine avec un p\u00e9rim\u00e8tre et un prix fermes. Le porteur de projet re\u00e7oit une installation op\u00e9rationnelle et le contractant assume les d\u00e9passements de co\u00fbts et de d\u00e9lais dans ce p\u00e9rim\u00e8tre. Pour une banque, cela \u00e9limine une grande partie du risque de construction, celui qui inqui\u00e8te le plus dans les premi\u00e8res phases.<\/p>\n<h3>Financement structur\u00e9 ou project finance<\/h3>\n<p>En project finance, la dette est rembours\u00e9e par les flux de tr\u00e9sorerie de l&rsquo;usine elle-m\u00eame, et non par le bilan du porteur de projet. On cr\u00e9e une soci\u00e9t\u00e9 de projet (SPV) qui signe les contrats et re\u00e7oit le financement. Le porteur apporte une part en fonds propres et le reste est de la dette. Le volume de dette mobilisable d\u00e9pend de la pr\u00e9visibilit\u00e9 des revenus et de la solidit\u00e9 des contrats.<\/p>\n<h3>Exploitation et maintenance<\/h3>\n<p>Un contrat d&rsquo;O&amp;M avec un exploitant qui conna\u00eet la technologie garantit la disponibilit\u00e9 de l&rsquo;usine. Pour le financeur, une usine \u00e0 l&rsquo;arr\u00eat est un pr\u00eat qui n&rsquo;est pas rembours\u00e9 ; l&rsquo;exp\u00e9rience de l&rsquo;exploitant compte donc autant que la conception.<\/p>\n<h3>Offtake<\/h3>\n<p>Le contrat d&rsquo;offtake engage un acheteur \u00e0 acqu\u00e9rir la production sur une longue p\u00e9riode et \u00e0 des conditions convenues. C&rsquo;est le contrat qui structure la ligne de revenus du mod\u00e8le financier.<\/p>\n<h2>Pourquoi l&rsquo;offtake d\u00e9termine la bancabilit\u00e9<\/h2>\n<p>Un projet est bancable lorsqu&rsquo;un financeur peut pr\u00e9voir avec une s\u00e9curit\u00e9 raisonnable que les flux couvriront la dette. En pyrolyse, la principale incertitude se situe g\u00e9n\u00e9ralement du c\u00f4t\u00e9 commercial : qui ach\u00e8te l&rsquo;huile, \u00e0 quel prix et pendant combien de temps.<\/p>\n<p>Un offtake \u00e0 long terme r\u00e9pond \u00e0 ces trois questions \u00e0 la fois. Il \u00e9limine le risque de ne pas trouver d&rsquo;acheteur, limite l&rsquo;exposition \u00e0 la volatilit\u00e9 des prix et permet de projeter les revenus sur toute la dur\u00e9e du pr\u00eat. Plus le pourcentage de production contractualis\u00e9e est \u00e9lev\u00e9 et plus l&rsquo;acheteur est solvable, plus il est facile de financer.<\/p>\n<p>L&rsquo;autre c\u00f4t\u00e9 de l&rsquo;\u00e9quation, c&rsquo;est le d\u00e9chet entrant. Un contrat d&rsquo;approvisionnement avec un gestionnaire de d\u00e9chets, une d\u00e9charge ou une industrie \u00e0 d\u00e9chet captif boucle la boucle. Pour beaucoup d&rsquo;entre eux, l&rsquo;usine permet en outre de r\u00e9duire les co\u00fbts, comme le montre <a href=\"https:\/\/nantek.es\/fr\/le-cout-de-ne-pas-valoriser-le-cout-reel-de-la-mise-en-decharge-par-tonne-jusquen-2030\/\">le co\u00fbt r\u00e9el de la mise en d\u00e9charge par tonne<\/a>.<\/p>\n<p>\u00c0 ces revenus peuvent s&rsquo;ajouter ceux issus de la certification du produit, qui d\u00e9pendent de sa destination finale. Nous l&rsquo;expliquons dans <a href=\"https:\/\/nantek.es\/fr\/iscc-plus-et-credits-environnementaux-comment-certifier-et-monetiser-loutput-de-la-pyrolyse\/\">ISCC PLUS et cr\u00e9dits environnementaux<\/a>.<\/p>\n<h2>Combien co\u00fbte une usine de pyrolyse : ce qui d\u00e9termine l&rsquo;investissement<\/h2>\n<p>Il n&rsquo;existe pas de prix catalogue. Le montant d\u00e9pend du projet, et toute estimation s\u00e9rieuse part d&rsquo;une \u00e9tude du d\u00e9chet et du site. Les facteurs qui le font le plus varier sont :<\/p>\n<ul>\n<li><strong>Capacit\u00e9 de traitement.<\/strong> Le tonnage annuel fixe la taille des \u00e9quipements et, avec eux, l&rsquo;essentiel de l&rsquo;investissement.<\/li>\n<li><strong>Type et qualit\u00e9 du d\u00e9chet.<\/strong> L&rsquo;humidit\u00e9, les contaminants et le degr\u00e9 de m\u00e9lange conditionnent le pr\u00e9traitement n\u00e9cessaire.<\/li>\n<li><strong>P\u00e9rim\u00e8tre de l&rsquo;EPC.<\/strong> S&rsquo;il inclut le g\u00e9nie civil, les b\u00e2timents, le pr\u00e9traitement, le stockage du produit et les raccordements, ou seulement le c\u0153ur du proc\u00e9d\u00e9.<\/li>\n<li><strong>Implantation.<\/strong> Un terrain d\u00e9j\u00e0 viabilis\u00e9 et desservi au sein d&rsquo;un complexe de traitement des d\u00e9chets co\u00fbte moins cher \u00e0 adapter qu&rsquo;une parcelle nouvelle.<\/li>\n<li><strong>Autorisations et proc\u00e9dure environnementale.<\/strong> Les d\u00e9lais et exigences varient selon la communaut\u00e9 autonome (r\u00e9gion espagnole).<\/li>\n<li><strong>Phases.<\/strong> Construire par modules permet de d\u00e9marrer avec un premier investissement plus faible et d&rsquo;\u00e9tendre ensuite.<\/li>\n<\/ul>\n<p>\u00c0 titre de r\u00e9f\u00e9rence publique, \u00e0 Cordoue, la premi\u00e8re phase de l&rsquo;usine convenue avec Sadeco et la municipalit\u00e9 a une capacit\u00e9 de 16 000 t\/an et un investissement de 22 M\u20ac. L&rsquo;extension pr\u00e9vue porterait l&rsquo;usine \u00e0 54 000 t\/an, pour un investissement total de 65 M\u20ac. Ce sont les chiffres d&rsquo;un projet pr\u00e9cis : ils donnent un ordre de grandeur \u00e0 cette \u00e9chelle, et non un tarif applicable \u00e0 d&rsquo;autres cas.<\/p>\n<h2>Les aides publiques envisageables<\/h2>\n<p>Les subventions financent rarement une usine enti\u00e8re, mais elles r\u00e9duisent les fonds propres n\u00e9cessaires et am\u00e9liorent la rentabilit\u00e9. Il convient d&rsquo;examiner chaque appel, car ils changent d&rsquo;une ann\u00e9e sur l&rsquo;autre.<\/p>\n<table>\n<thead>\n<tr>\n<th>Programme<\/th>\n<th>Ce qu&rsquo;il finance<\/th>\n<th>Points d&rsquo;attention<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>PERTE \u00c9conomie circulaire (programme strat\u00e9gique espagnol du MITECO, fonds Next Generation EU)<\/td>\n<td>Projets de circularit\u00e9 dans le secteur du plastique, y compris la gestion de d\u00e9chets de tiers<\/td>\n<td>La derni\u00e8re ligne consacr\u00e9e au plastique, attribu\u00e9e en mars 2026, a accord\u00e9 plus de 150 M\u20ac \u00e0 115 projets, avec des aides de 100 000 \u20ac \u00e0 8,7 M\u20ac ; les projets doivent \u00eatre achev\u00e9s avant le 31 octobre 2027<\/td>\n<\/tr>\n<tr>\n<td>Hazitek (gouvernement basque, g\u00e9r\u00e9 par la SPRI)<\/td>\n<td>Recherche industrielle et d\u00e9veloppement exp\u00e9rimental des entreprises ayant une activit\u00e9 au Pays basque<\/td>\n<td>Cofinanc\u00e9 par le FEDER dans le cadre du programme FEDER Pays basque 2021-2027 ; orient\u00e9 R&amp;D, pas vers les usines commerciales<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>La distinction est importante. Le PERTE a soutenu des investissements industriels, tandis qu&rsquo;Hazitek finance le d\u00e9veloppement technologique en amont. Nantek, par exemple, m\u00e8ne le projet de R&amp;D REFIK avec un financement d&rsquo;Hazitek et du FEDER. Ce type d&rsquo;aide acc\u00e9l\u00e8re l&rsquo;am\u00e9lioration de la technologie, pas l&rsquo;achat d&rsquo;une usine.<\/p>\n<p>La pression r\u00e9glementaire joue aussi en faveur du financement : avec l&rsquo;objectif europ\u00e9en de limiter la mise en d\u00e9charge, les gestionnaires ont besoin d&rsquo;alternatives, comme l&rsquo;explique <a href=\"https:\/\/nantek.es\/fr\/zero-mise-en-decharge-en-2035-ce-quexige-lue-et-comment-sy-preparer\/\">z\u00e9ro mise en d\u00e9charge en 2035<\/a>.<\/p>\n<h2>Les risques du projet et comment les att\u00e9nuer<\/h2>\n<ol>\n<li><strong>Risque technologique.<\/strong> Que l&rsquo;usine n&rsquo;atteigne pas la production pr\u00e9vue. On l&rsquo;att\u00e9nue avec une technologie valid\u00e9e \u00e0 l&rsquo;\u00e9chelle industrielle et des garanties de performance dans le contrat EPC.<\/li>\n<li><strong>Risque de construction.<\/strong> Surco\u00fbts et retards. On l&rsquo;att\u00e9nue avec un EPC \u00e0 p\u00e9rim\u00e8tre et prix fermes.<\/li>\n<li><strong>Risque d&rsquo;approvisionnement.<\/strong> Manque de d\u00e9chets ou qualit\u00e9 inadapt\u00e9e. On l&rsquo;att\u00e9nue avec des contrats d&rsquo;entr\u00e9e \u00e0 long terme et une technologie qui accepte le plastique m\u00e9lang\u00e9.<\/li>\n<li><strong>Risque de march\u00e9.<\/strong> Ne pas vendre le produit ou le vendre \u00e0 bas prix. On l&rsquo;att\u00e9nue avec un offtake \u00e0 long terme.<\/li>\n<li><strong>Risque op\u00e9rationnel.<\/strong> Arr\u00eats impr\u00e9vus. On l&rsquo;att\u00e9nue avec un contrat d&rsquo;O&amp;M et une surveillance continue.<\/li>\n<li><strong>Risque r\u00e9glementaire.<\/strong> Changements dans les autorisations ou dans le traitement des produits. On l&rsquo;att\u00e9nue avec des d\u00e9marches engag\u00e9es t\u00f4t et des certifications en vigueur.<\/li>\n<\/ol>\n<h2>Comment Nantek y r\u00e9pond<\/h2>\n<p>Nantek r\u00e9unit tous les \u00e9l\u00e9ments dans un <a href=\"https:\/\/nantek.es\/fr\/le-modele\/\">mod\u00e8le int\u00e9gral unique<\/a>, avec un seul interlocuteur :<\/p>\n<ul>\n<li><strong>EPC cl\u00e9 en main<\/strong> avec p\u00e9rim\u00e8tre et prix fermes.<\/li>\n<li><strong>Financement structur\u00e9<\/strong> jusqu&rsquo;\u00e0 70 % de l&rsquo;investissement.<\/li>\n<li><strong>O&amp;M<\/strong> avec pilotage \u00e0 distance et logiciel propri\u00e9taire.<\/li>\n<li><strong>Offtake :<\/strong> achat garanti de 100 % du produit avec des contrats \u00e0 long terme.<\/li>\n<li><strong>Cr\u00e9dits environnementaux :<\/strong> gestion des certifications et r\u00e9trocession au client d&rsquo;une partie du b\u00e9n\u00e9fice net.<\/li>\n<\/ul>\n<p>La technologie, une pyrolyse thermique sans catalyseurs avec des agents r\u00e9actifs propri\u00e9taires, est valid\u00e9e depuis 2022 dans l&rsquo;usine industrielle du port de Bilbao, avec du plastique m\u00e9lang\u00e9 sans tri pr\u00e9alable. La gamme modulaire va de 1 500 \u00e0 16 000 t\/an, ce qui permet de dimensionner l&rsquo;usine en fonction du d\u00e9chet et de la capacit\u00e9 d&rsquo;investissement de chaque client. Elle s&rsquo;adresse aux <a href=\"https:\/\/nantek.es\/fr\/pyrolyse-pour-decharges-et-grands-gestionnaires-du-passif-financier-au-revenu-recurrent\/\">d\u00e9charges et grands gestionnaires de d\u00e9chets<\/a>, \u00e0 l&rsquo;industrie \u00e0 d\u00e9chet captif ainsi qu&rsquo;aux administrations et concessionnaires.<\/p>\n<h2>Questions fr\u00e9quentes sur le financement d&rsquo;une usine de pyrolyse<\/h2>\n<h3>Combien co\u00fbte une usine de pyrolyse ?<\/h3>\n<p>Cela d\u00e9pend de la capacit\u00e9, du d\u00e9chet, du p\u00e9rim\u00e8tre et de l&rsquo;implantation. \u00c0 titre de r\u00e9f\u00e9rence, la premi\u00e8re phase de l&rsquo;usine de Cordoue, de 16 000 t\/an, repr\u00e9sente 22 M\u20ac.<\/p>\n<h3>Qu&rsquo;est-ce qu&rsquo;un EPC cl\u00e9 en main ?<\/h3>\n<p>Un contrat dans lequel un contractant unique con\u00e7oit, fournit, construit et met en service l&rsquo;usine avec un p\u00e9rim\u00e8tre et un prix fermes.<\/p>\n<h3>Pourquoi le contrat d&rsquo;offtake est-il si important ?<\/h3>\n<p>Parce qu&rsquo;il garantit la vente du produit \u00e0 long terme. Sans revenus pr\u00e9visibles, un financeur ne peut pas dimensionner la dette.<\/p>\n<h3>Quelle part de l&rsquo;investissement le porteur de projet doit-il apporter ?<\/h3>\n<p>Cela d\u00e9pend de la structure. Dans le mod\u00e8le de Nantek, le financement structur\u00e9 peut couvrir jusqu&rsquo;\u00e0 70 % de l&rsquo;investissement.<\/p>\n<h3>Existe-t-il des subventions pour les usines de pyrolyse ?<\/h3>\n<p>Des lignes comme le PERTE \u00c9conomie circulaire pour l&rsquo;investissement, ou des programmes de R&amp;D comme Hazitek au Pays basque, peuvent \u00eatre adapt\u00e9es. Il faut examiner chaque appel en vigueur.<\/p>\n<p>Si vous envisagez une usine et souhaitez savoir comment son financement serait structur\u00e9, <a href=\"https:\/\/nantek.es\/fr\/contact-2\/\">pr\u00e9sentez-nous votre projet et nous l&rsquo;\u00e9tudierons avec vous<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Une usine de pyrolyse se finance comme un projet industriel, et non [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11297,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[108,109],"tags":[],"class_list":["post-11530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pyrolyse","category-usine"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Comment financer une usine de pyrolyse | Nantek<\/title>\n<meta name=\"description\" content=\"Comment financer une usine de pyrolyse : le mod\u00e8le cl\u00e9 en main combine EPC, jusqu&#039;\u00e0 70% de financement structur\u00e9 et un achat garanti du produit.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comment financer une usine de pyrolyse | Nantek\" \/>\n<meta property=\"og:description\" content=\"Comment financer une usine de pyrolyse : le mod\u00e8le cl\u00e9 en main combine EPC, jusqu&#039;\u00e0 70% de financement structur\u00e9 et un achat garanti du produit.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/\" \/>\n<meta property=\"og:site_name\" content=\"Nantek - Sustainable Solutions\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-28T19:54:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1344\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"bkn@bikain.studio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"bkn@bikain.studio\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/\"},\"author\":{\"name\":\"bkn@bikain.studio\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/person\\\/b14b4b5281b50c857250cd9944820db4\"},\"headline\":\"Comment financer une usine de pyrolyse : le mod\u00e8le EPC + financement + achat garanti\",\"datePublished\":\"2026-06-28T19:54:21+00:00\",\"dateModified\":\"2026-10-19T14:43:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/\"},\"wordCount\":1825,\"publisher\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"articleSection\":[\"Pyrolyse\",\"Usine\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/\",\"url\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/\",\"name\":\"Comment financer une usine de pyrolyse | Nantek\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"datePublished\":\"2026-06-28T19:54:21+00:00\",\"dateModified\":\"2026-10-19T14:43:49+00:00\",\"description\":\"Comment financer une usine de pyrolyse : le mod\u00e8le cl\u00e9 en main combine EPC, jusqu'\u00e0 70% de financement structur\u00e9 et un achat garanti du produit.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/#primaryimage\",\"url\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"contentUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/planta-pirolisis-16000-toneladas.jpeg\",\"width\":1344,\"height\":768,\"caption\":\"Usine de pyrolyse Nantek de 16 000 tonnes par an\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/nantek.es\\\/fr\\\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/nantek.es\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Comment financer une usine de pyrolyse : le mod\u00e8le EPC + financement + achat garanti\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#website\",\"url\":\"https:\\\/\\\/nantek.es\\\/\",\"name\":\"Nantek - Sustainable Solutions\",\"description\":\"from plastic waste to new raw materials\",\"publisher\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/nantek.es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#organization\",\"name\":\"Nantek\",\"alternateName\":\"Nantek Hub SL\",\"url\":\"https:\\\/\\\/nantek.es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/horizontal-nantek-logo-and-title.png\",\"contentUrl\":\"https:\\\/\\\/nantek.es\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/horizontal-nantek-logo-and-title.png\",\"width\":159,\"height\":22,\"caption\":\"Nantek\"},\"image\":{\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/nantekhub\\\/\",\"https:\\\/\\\/youtube.com\\\/@nantekhub\",\"https:\\\/\\\/www.instagram.com\\\/nantek.es\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/nantek.es\\\/#\\\/schema\\\/person\\\/b14b4b5281b50c857250cd9944820db4\",\"name\":\"bkn@bikain.studio\",\"sameAs\":[\"http:\\\/\\\/nantek.es\"],\"url\":\"https:\\\/\\\/nantek.es\\\/fr\\\/author\\\/bknbikain-studio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comment financer une usine de pyrolyse | Nantek","description":"Comment financer une usine de pyrolyse : le mod\u00e8le cl\u00e9 en main combine EPC, jusqu'\u00e0 70% de financement structur\u00e9 et un achat garanti du produit.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/","og_locale":"fr_FR","og_type":"article","og_title":"Comment financer une usine de pyrolyse | Nantek","og_description":"Comment financer une usine de pyrolyse : le mod\u00e8le cl\u00e9 en main combine EPC, jusqu'\u00e0 70% de financement structur\u00e9 et un achat garanti du produit.","og_url":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/","og_site_name":"Nantek - Sustainable Solutions","article_published_time":"2026-06-28T19:54:21+00:00","article_modified_time":"2026-10-19T14:43:49+00:00","og_image":[{"width":1344,"height":768,"url":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","type":"image\/jpeg"}],"author":"bkn@bikain.studio","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"bkn@bikain.studio"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/#article","isPartOf":{"@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/"},"author":{"name":"bkn@bikain.studio","@id":"https:\/\/nantek.es\/#\/schema\/person\/b14b4b5281b50c857250cd9944820db4"},"headline":"Comment financer une usine de pyrolyse : le mod\u00e8le EPC + financement + achat garanti","datePublished":"2026-06-28T19:54:21+00:00","dateModified":"2026-10-19T14:43:49+00:00","mainEntityOfPage":{"@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/"},"wordCount":1825,"publisher":{"@id":"https:\/\/nantek.es\/#organization"},"image":{"@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/#primaryimage"},"thumbnailUrl":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","articleSection":["Pyrolyse","Usine"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/","url":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/","name":"Comment financer une usine de pyrolyse | Nantek","isPartOf":{"@id":"https:\/\/nantek.es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/#primaryimage"},"image":{"@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/#primaryimage"},"thumbnailUrl":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","datePublished":"2026-06-28T19:54:21+00:00","dateModified":"2026-10-19T14:43:49+00:00","description":"Comment financer une usine de pyrolyse : le mod\u00e8le cl\u00e9 en main combine EPC, jusqu'\u00e0 70% de financement structur\u00e9 et un achat garanti du produit.","breadcrumb":{"@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/#primaryimage","url":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","contentUrl":"https:\/\/nantek.es\/wp-content\/uploads\/planta-pirolisis-16000-toneladas.jpeg","width":1344,"height":768,"caption":"Usine de pyrolyse Nantek de 16 000 tonnes par an"},{"@type":"BreadcrumbList","@id":"https:\/\/nantek.es\/fr\/comment-financer-une-usine-de-pyrolyse-le-modele-epc-financement-achat-garanti\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/nantek.es\/fr\/"},{"@type":"ListItem","position":2,"name":"Comment financer une usine de pyrolyse : le mod\u00e8le EPC + financement + achat garanti"}]},{"@type":"WebSite","@id":"https:\/\/nantek.es\/#website","url":"https:\/\/nantek.es\/","name":"Nantek - Sustainable Solutions","description":"from plastic waste to new raw materials","publisher":{"@id":"https:\/\/nantek.es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nantek.es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/nantek.es\/#organization","name":"Nantek","alternateName":"Nantek Hub SL","url":"https:\/\/nantek.es\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/nantek.es\/#\/schema\/logo\/image\/","url":"https:\/\/nantek.es\/wp-content\/uploads\/2024\/09\/horizontal-nantek-logo-and-title.png","contentUrl":"https:\/\/nantek.es\/wp-content\/uploads\/2024\/09\/horizontal-nantek-logo-and-title.png","width":159,"height":22,"caption":"Nantek"},"image":{"@id":"https:\/\/nantek.es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/nantekhub\/","https:\/\/youtube.com\/@nantekhub","https:\/\/www.instagram.com\/nantek.es\/"]},{"@type":"Person","@id":"https:\/\/nantek.es\/#\/schema\/person\/b14b4b5281b50c857250cd9944820db4","name":"bkn@bikain.studio","sameAs":["http:\/\/nantek.es"],"url":"https:\/\/nantek.es\/fr\/author\/bknbikain-studio\/"}]}},"_links":{"self":[{"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/posts\/11530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/comments?post=11530"}],"version-history":[{"count":2,"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/posts\/11530\/revisions"}],"predecessor-version":[{"id":11613,"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/posts\/11530\/revisions\/11613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/media\/11297"}],"wp:attachment":[{"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/media?parent=11530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/categories?post=11530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nantek.es\/fr\/wp-json\/wp\/v2\/tags?post=11530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}